---
title: Ark Cody Park
date: 2026-10-13T18:54:00+01:00
canonical_url: "https://datacentrefinder.co.uk/data-centres/ark-cody-park"
section: Data Centres
date_modified: 2026-10-28T09:33:34+00:00
operator: Ark Data Centres
---
# Ark Cody Park

South East · England · United Kingdom

Ark Cody Park is a data-centre campus operated by Ark Data Centres in Farnborough, Hampshire (postcode GU14 0LH).

[Compiled from the operator’s published information ](#verification)

- Free to use
- Independent service
- No obligation

## The facility at a glance.

[Standards &amp; resilience **8 standards listed**Explore standards and resilience details →](#compliance)

## About this data centre

Enterprise colocation campus in Farnborough, Hampshire

Ark Cody Park is a 36-acre data-centre campus in Farnborough, Hampshire, built in phased modular compounds. Ark offers enterprise colocation at Cody Park, including private suites and shared environments, with cloud interconnection via cross-connects and fibre partners. Uptime Institute's UK award index lists Cody Park with an M&amp;O Stamp of Approval.

Ark lists 51 MW of total compute capacity across six data centres at Cody Park and gives a ready-for-service date of 2011 (figures updated 1 January 2025). Ark describes off-site modular construction, a sub-1.3 PUE, Tier 3 availability and proximity to London for synchronous replication, with indirect air, direct air and liquid cooling technologies.

### Services &amp; suitable workloads

- Colocation

- Opened: 2011

- Data centres on campus: 6 (Ark)
- Ready for service: 2011 (Ark)
- Figures updated: 1 January 2025 (Ark)
- Campus area: 36 acres (Ark)

### Power infrastructure

- Total facility capacity: 51 MW

### Cooling systems

- Cooling type: Operator campus page describes direct/indirect air cooling and liquid cooling (technology description, not building inventory)

Ark lists 51 MW of total compute capacity at Cody Park (Ark figures updated 1 January 2025).

### Sustainability

Ark describes Cody Park's off-site modular construction, using recyclable steel rather than concrete, and a sub-1.3 PUE.

Cloud interconnection via cross-connects and fibre partners.

### Compliance overview

Ark Data Centres lists ISO 9001, ISO 14001, ISO 22301, ISO 27001, ISO 45001, ISO 50001, Cyber Essentials Plus and PCI DSS in its company-wide standards. Facility-level certificate scope is not published.

### Operator’s tier statement

Operator describes Tier 3 resilience/availability; Uptime Institute lists Cody Park with an M&amp;O Stamp of Approval (management and operations, not a Tier certification).

### Listed standards

#### ISO 9001

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### ISO 14001

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### ISO 27001

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### ISO 22301

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### ISO 45001

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### ISO 50001

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### Cyber Essentials

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

#### PCI DSS

- Scope details: Ark lists this standard in its site-wide standards list; facility scope is not stated.

A57, Cody Park, Old Ively Road, South East, GU14 0LH[Get directions ↗ (opens in a new tab)](https://www.google.com/maps/dir/?api=1&destination=A57%2C%20Cody%20Park%2C%20Old%20Ively%20Road%2C%20South%20East%2C%20GU14%200LH)

## Frequently asked questions

### Where is Ark Cody Park?

Ark Cody Park is a 36-acre campus near Farnborough, Hampshire, at A57 Cody Park, Old Ively Road, GU14 0LH.

### How much capacity does Cody Park have?

Ark lists 51 MW of total compute capacity across six data centres (figures updated 1 January 2025).

### When did Cody Park open?

Ark gives a ready-for-service date of 2011 for Cody Park.

### What cooling does Cody Park use?

Ark lists indirect air cooling, direct air cooling and liquid cooling technologies and a sub-1.3 PUE for Cody Park.

### Which certifications does Ark list?

Ark lists ISO 9001, 14001, 22301, 27001, 45001 and 50001, Cyber Essentials Plus and PCI DSS company-wide. Confirm facility scope with Ark.

## About this listing

These details help you assess the listing. Confirm current availability and suitability with the operator.

- Status: Compiled from the operator’s published information
- Last reviewed: Not yet reviewed

## Does Ark Cody Park fit your plans?

Our free, independent enquiry service helps you confirm pricing, availability and the requirements that matter to your deployment. No obligation to proceed.

[Ask about pricing &amp; availability ↗](/enquire?facility=2748)Add to compare
