NTT publishes an average power density of 2.5 kW/m² for London 1; rack and cage options are not listed.
Technical specifications
- Fire suppression
- Water mist fire suppression with VESDA detection
- Aisle containment
- Hot aisle
- IT space
- 12,800 m² in first building; 25,600 m² at full build
- Critical IT load
- 32 MW; 64 MW at full build
- Substation
- On-site, 80 MVA; two 132/11 kV transformers (2N)
- Grid supply
- 132 kV from two grid connections
- Average power density
- 2.5 kW/m²
- Fire separation
- Fire walls, minimum 60 minutes