Cabinet colocation; standard air-cooled density 2–7kW, up to 15kW per cabinet. Confirm current allocation.
Technical specifications
- Fire suppression
- Data-hall fire suppression; agent not specified.
South West · England · United Kingdom
nLighten BRS2 provides colocation in Swindon. The operator publishes 1,580m² of dedicated colocation space. The facility is part of nLighten’s UK edge data centre portfolio.
THE ESSENTIALS
OVERVIEW
Carrier-neutral colocation in Swindon, Wiltshire
Find the right amount of space for your equipment.
Cabinet colocation; standard air-cooled density 2–7kW, up to 15kW per cabinet. Confirm current allocation.
Check the power your deployment needs and the systems behind it.
Independent A/B cabinet feeds. Published site capacity is end-state, not confirmed commissioned power.
Operator describes Guarantees of Origin and PPAs; PUE 1.29 is a design figure. Heat recovery remains a feasibility study.
Explore network choice and the connections available to your equipment.
Carrier-neutral; diverse fibre entry points and meet-me areas; nConnect platform.
Review how access to the site and equipment is protected.
PIN/biometric access controls and CCTV.
Check listed standards, their scope and the evidence recorded.
Check current site-specific certificates and their scope; no uninspected certificate award is asserted.
Tier III design target only; no awarded certification asserted.
Plan visits, deliveries and access for your team.
YOUR QUESTIONS, ANSWERED
These details help you assess the listing. Confirm current availability and suitability with the operator.