Motorway
M62
nLighten: close to the M62 motorway.
Leeds · Yorkshire and the Humber · England · United Kingdom
nLighten Leeds LBA1 is a carrier-neutral edge colocation data centre at White Rose Technology Centre, Normanton Industrial Estate, WF6 1TD, close to the M62.
THE ESSENTIALS
OVERVIEW
nLighten carrier-neutral edge colocation for Leeds (LBA1)
Find the right amount of space for your equipment.
| Rack format | Configuration & compatibility | Reported availability |
|---|---|---|
| High-density rack |
High-density (AI-ready) cabinets of 15 kW to 150+ kW on request. | On request |
nLighten offers cabinets in a pre-defined modular aisle and containment system. Standard air-cooled density is 2–7 kW, up to 15 kW per cabinet; high-density (AI-ready) cabinets of 15 kW to 150+ kW are available on request.
Check the power your deployment needs and the systems behind it.
| Power option | Configuration & compatibility | Reported availability |
|---|---|---|
| 2 kW+ |
Standard air-cooled density 2–7 kW, up to 15 kW per cabinet. | Available |
| 5 kW+ |
Standard air-cooled density 2–7 kW, up to 15 kW per cabinet. | Available |
| 10 kW+ |
Standard air-cooled density 2–7 kW, up to 15 kW per cabinet. | Available |
| 15 kW+ |
High-density (AI-ready) 15 kW to 150+ kW on request. | On request |
| 20 kW+ |
High-density (AI-ready) 15 kW to 150+ kW on request. | On request |
| 30 kW+ / custom |
High-density (AI-ready) 15 kW to 150+ kW on request. | On request |
nLighten lists redundant power with independent A and B feeds to each cabinet, 3,600 kW site capacity at end-state, a design PUE of 1.29, standard density of 2–7 kW up to 15 kW per cabinet, and 15 kW to 150+ kW high-density on request.
nLighten lists a design PUE of 1.29, 100% carbon-free energy backed by Guarantees of Origin, power purchase agreements, a calculated Integrated Carbon-Free Energy (ICFEn) score, and a feasibility study for heat recovery to local heating networks.
Explore network choice and the connections available to your equipment.
nLighten describes LBA1 as carrier neutral with diverse fibre entry points and meet-me areas for rapid activation, and says customers can select from more than 65 carriers and partners across its European footprint.
Review how access to the site and equipment is protected.
nLighten lists dual-factor access control (PIN and biometrics), full-coverage CCTV, fire suppression in the data hall, and a 24/7 service desk with 24/7 NOC access.
Check listed standards, their scope and the evidence recorded.
nLighten states a Tier III design target (not certified). Facility certifications are not listed on the LBA1 page.
nLighten states a Tier III design target. No Uptime Institute certification is published.
Plan visits, deliveries and access for your team.
nLighten says the site is close to the M62 motorway, 15 minutes by car from Leeds station and 40 minutes from Leeds Bradford Airport, with ample parking.
Motorway
nLighten: close to the M62 motorway.
Rail
nLighten: 15 minutes by car.
Airport
nLighten: 40 minutes.
YOUR QUESTIONS, ANSWERED
These details help you assess the listing. Confirm current availability and suitability with the operator.